Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0399 #09 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,017 $1,719
UF0399 #08 Y:2007 Use waste heat from hot flue gases to preheat $47,277 $35,000
UF0399 #07 Y:2007 Utilize higher efficiency lamps and/or ballasts $20,311 $44,692
UF0399 #06 Y:2007 Utilize energy-efficient belts and other improved mechanisms $939 -
UF0399 #05 Y:2007 Use optimum thickness insulation $1,157 $188
UF0399 #04 Y:2007 Reduce the pressure of compressed air to the minimum required $8,852 -
UF0399 #03 Y:2007 Install compressor air intakes in coolest locations $3,878 $437
UF0399 #02 Y:2007 Re-size charging openings or add movable cover or door $349 $1,376
UF0399 #01 Y:2007 Improve air circulation with destratification fans / other methods $3,373 $24,800
MZ0002 #06 Y:2007 Install compressor air intakes in coolest locations $1,500 $1,200
MZ0002 #05 Y:2007 Utilize controls to operate equipment only when needed $2,700 -
MZ0002 #04 Y:2007 Install occupancy sensors $2,300 $1,475
MZ0002 #03 Y:2007 Utilize higher efficiency lamps and/or ballasts $40,930 $40,700
MZ0002 #02 Y:2007 Replace direct fired with steam heat $35,480 $78,000
MZ0002 #01 Y:2007 Re-size charging openings or add a movable door on equipment $19,616 $21,000
IC0126 #07 Y:2007 Change rate schedules or other changes in utility service $59,636 -
IC0126 #06 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $609 $800
IC0126 #05 Y:2007 Utilize higher efficiency lamps and/or ballasts $1,123 $1,575
IC0126 #04 Y:2007 Turn off equipment when not in use $1,467 -
IC0126 #03 Y:2007 Use optimum thickness insulation $5,113 $2,715