ITAC Assessment: MZ0002
ITAC logo
ITAC Assessment: MZ0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product food preparation, storage, and warming equipment for commercial restaura
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $50
M
to 100
M
# of Employees 304
Plant Area 500,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 8,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,843 5,953,600
kWh
Natural Gas $241,032 21,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings
01 2.1122: Re-size charging openings or add a movable door on equipment $19,616 $21,000 - - - $19,616
-
MMBtu
-
02 2.1124: Replace direct fired with steam heat $35,480 $78,000 $1
1
kWh
- $1 $35,477
-
MMBtu
$1
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $40,930 $40,700 $32,460
618,280
kWh
$8,470
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $2,300 $1,475 $2,300
393,800
kWh
- - - -
05 2.6231: Utilize controls to operate equipment only when needed $2,700 - $2,700
53,936
kWh
- - - -
06 2.4221: Install compressor air intakes in coolest locations $1,500 $1,200 $1,500
28,570
kWh
- - - -
TOTAL RECOMMENDED $102,526 $142,375 $38,961
1,094,587
kWh
$8,470
-
kW-mo/yr
$1 $55,093
-
MMBtu
$1
-
MMBtu
TOTAL IMPLEMENTED $40,930 $40,700 $32,460
618,280
kWh
$8,470
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs