| Assessment Year | 2007 |
|---|---|
| Principal Product | Filters |
| NAICS | 333249: Other Industrial Machinery Manufacturing |
| SIC | 3841: Surgical and Medical Instruments and Apparatus |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
105,000
ft2
|
| Annual Production | 40,000,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $632,720 | 14,466,032 |
kWh
|
$0.044 |
| Electricity Demand | $245,030 | 30,036 |
kW-mo/yr
|
$8.16 |
| Natural Gas | $645,321 | 54,747 |
MMBtu
|
$11.79 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $165,771 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $90,348 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $3,373 | $24,800 |
$3,373
73,325
kWh
|
- | - | - | - | |
| 02 | 2.2531: Re-size charging openings or add movable cover or door | $349 | $1,376 |
$349
7,596
kWh
|
- | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $3,878 | $437 |
$3,878
84,310
kWh
|
- | - | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,852 | - |
$8,852
140,514
kWh
|
- | - | - | - | |
| 05 | 2.2515: Use optimum thickness insulation | $1,157 | $188 | - | - |
$1,157
-
MMBtu
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $939 | - |
$939
9,353
kWh
|
- | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,311 | $44,692 |
$14,906
324,044
kWh
|
$5,405
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $47,277 | $35,000 | - | - |
$47,277
-
MMBtu
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,017 | $1,719 |
$1,929
7,556
kWh
|
$88
-
kW-mo/yr
|
- | - | - | |
| 10 | 2.7135: Install occupancy sensors | $1,761 | $404 |
$1,761
38,284
kWh
|
- | - | - | - | |
| 11 | 3.5318: Recycle fluorescent lamps | $1,005 | $3,486 | - | - | - | $1,005 | - | |
| 12 | 4.632: Change operating conditions | $74,852 | $731 | - | - | - | - | $74,852 | |
| TOTAL RECOMMENDED | $165,771 | $112,833 |
$35,987
684,982
kWh
|
$5,493
-
kW-mo/yr
|
$48,434
-
MMBtu
|
$1,005 | $74,852 | ||
| TOTAL IMPLEMENTED | $90,348 | $5,058 |
$14,491
263,108
kWh
|
- | - | $1,005 | $74,852 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs