Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product MEN'S PANTS
NAICS
n/a
SIC 2325: Men's and Boys' Separate Trousers and Slacks
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area
n/a
Annual Production 159,600
pieces
Production Hrs. Annual 1,960
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,668 837,339
kWh
Natural Gas $26,592 8,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,518 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,931 $1,900 - $8,931
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,067 $400 $4,067
104,338
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,124 $6,215 $4,124
105,803
kWh
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $648 - $648
16,706
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $748 $359 $748
19,050
kWh
-
TOTAL RECOMMENDED $18,518 $8,874 $9,587
245,897
kWh
$8,931
-
MMBtu
TOTAL IMPLEMENTED $18,518 $8,874 $9,587
245,897
kWh
$8,931
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs