ITAC Assessment: OR0612
ITAC logo
ITAC Assessment: OR0612
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Green Stud Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 75,000
ft2
Annual Production 90,000
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $698,998 12,453,900
kWh
Electricity Demand $216,818 31,402
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,436 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $30,841 $79,939 $25,274
456,217
kWh
$5,567
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,184 $10,125 $8,600
155,241
kWh
$2,584
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $7,387 $13,420 $5,843
105,470
kWh
$1,002
-
kW-mo/yr
$540 $2
04 2.7243: Improve air circulation with destratification fans / other methods $4,981 $4,470 $3,262
58,872
kWh
$1,719
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,043 $922 $2,043
36,872
kWh
- - -
TOTAL RECOMMENDED $56,436 $108,876 $45,022
812,672
kWh
$10,872
-
kW-mo/yr
$540 $2
TOTAL IMPLEMENTED $20,614 $24,467 $16,486
297,583
kWh
$3,586
-
kW-mo/yr
$540 $2
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs