Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Process equipment for pharmaceutical production
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area 62,399
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 6,461
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,198 3,477,164
kWh
Electricity Demand $108,062 8,787
kW-mo/yr
Natural Gas $29,531 2,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,851

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,723 $55,780 $14,723
179,510
kWh
- - -
02 2.4133: Use most efficient type of electric motors $6,647 $21,248 $6,647
95,501
kWh
- - -
03 2.2515: Use optimum thickness insulation $5,113 $2,715 $5,113
88,388
kWh
- - -
04 2.6218: Turn off equipment when not in use $1,467 - $1,467
35,771
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,123 $1,575 $302
7,359
kWh
$125
-
kW-mo/yr
$314 $382
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $609 $800 $609
14,849
kWh
- - -
07 2.8114: Change rate schedules or other changes in utility service $59,636 - $59,636
-
kWh
- - -
TOTAL RECOMMENDED $89,318 $82,118 $88,497
421,378
kWh
$125
-
kW-mo/yr
$314 $382
TOTAL IMPLEMENTED $87,851 $82,118 $87,030
385,607
kWh
$125
-
kW-mo/yr
$314 $382
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs