| Assessment Year | 2007 |
|---|---|
| Principal Product | Process equipment for pharmaceutical production |
| NAICS | 333249: Other Industrial Machinery Manufacturing |
| SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 148 |
| Plant Area |
62,399
ft2
|
| Annual Production | 200,000
pieces
|
| Production Hrs. Annual | 6,461
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $144,198 | 3,477,164 |
kWh
|
$0.041 |
| Electricity Demand | $108,062 | 8,787 |
kW-mo/yr
|
$12.30 |
| Natural Gas | $29,531 | 2,538 |
MMBtu
|
$11.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $89,318 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $87,851 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,723 | $55,780 |
$14,723
179,510
kWh
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $6,647 | $21,248 |
$6,647
95,501
kWh
|
- | - | - | |
| 03 | 2.2515: Use optimum thickness insulation | $5,113 | $2,715 |
$5,113
88,388
kWh
|
- | - | - | |
| 04 | 2.6218: Turn off equipment when not in use | $1,467 | - |
$1,467
35,771
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,123 | $1,575 |
$302
7,359
kWh
|
$125
-
kW-mo/yr
|
$314 | $382 | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $609 | $800 |
$609
14,849
kWh
|
- | - | - | |
| 07 | 2.8114: Change rate schedules or other changes in utility service | $59,636 | - |
$59,636
-
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $89,318 | $82,118 |
$88,497
421,378
kWh
|
$125
-
kW-mo/yr
|
$314 | $382 | ||
| TOTAL IMPLEMENTED | $87,851 | $82,118 |
$87,030
385,607
kWh
|
$125
-
kW-mo/yr
|
$314 | $382 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs