Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

781

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Industrial machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0833 #12 Y:2011 Interlock heating and air conditioning systems to prevent simultaneous operation $37,935 $100
UD0833 #11 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $83,814 $10,000
UD0833 #10 Y:2011 Turn off equipment when not in use $844 $50
UD0833 #09 Y:2011 Minimize operation of equipment maintained in standby condition $5,553 $100
UD0833 #08 Y:2011 Meter recycled water (to reduce sewer charges) $7,523 $10,500
UD0833 #07 Y:2011 Meter recycled water (to reduce sewer charges) $11,144 $600
UD0833 #06 Y:2011 Install compressor air intakes in coolest locations $3,343 $500
UD0833 #05 Y:2011 Upgrade obsolete equipment $3,710 $12,661
UD0833 #04 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $5,026 $500
UD0833 #03 Y:2011 Upgrade controls on compressors $24,064 $1,075
UD0833 #02 Y:2011 Utilize energy-efficient belts and other improved mechanisms $4,467 $25
UD0833 #01 Y:2011 Install occupancy sensors $2,272 $300
TT0061 #04 Y:2011 Apply for tax-free status for energy purchases $4,900 -
TT0061 #03 Y:2011 Use adjustable frequency drive or multiple speed motors on existing system $513 $1,200
TT0061 #02 Y:2011 Turn off equipment when not in use $195 -
TT0061 #01 Y:2011 Utilize higher efficiency lamps and/or ballasts $2,100 $4,800
SU0305 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $11,642 $60,207
SU0305 #04 Y:2010 Optimize plant power factor $4,313 $16,531
SU0305 #03 Y:2010 Improve air circulation with destratification fans / other methods $12,040 $34,682
SU0305 #02 Y:2010 Conserve energy by efficient use of vending machines $344 $645