Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

402

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Oil and gas field machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0759 #07 Y:2018 Use synthetic lubricant $231 $100
AM0759 #06 Y:2018 Utilize daylight whenever possible in lieu of artificial light $1,207 $100
AM0759 #05 Y:2018 Eliminate or reduce compressed air usage $1,676 $700
AM0759 #04 Y:2018 Pay utility bills on time $2,702 $100
AM0759 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $3,305 $100
AM0759 #02 Y:2018 Optimize plant power factor $5,714 $12,461
AM0759 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $9,939 $12,678
AM0752 #07 Y:2018 Reduce illumination to minimum necessary levels $680 $40
AM0752 #06 Y:2018 Apply for tax-free status for energy purchases $7,385 $1,500
AM0752 #05 Y:2018 Eliminate or reduce compressed air usage $1,750 $980
AM0752 #04 Y:2018 Optimize plant power factor $5,140 $9,860
AM0752 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $5,590 $6,500
AM0752 #02 Y:2018 Begin a practice of predictive / preventative maintenance $9,150 $4,570
AM0752 #01 Y:2018 Use a less expensive method of waste removal $79,100 $11,000
OK0966 #09 Y:2017 Repair faulty insulation in furnaces, boilers, etc $36 $100
OK0966 #08 Y:2017 Cover open tanks $2,956 $1,250
OK0966 #07 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $3,676 $17,550
OK0966 #06 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $6,570 $17,250
OK0966 #05 Y:2017 Turn off equipment when not in use $7,886 -
OK0966 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,526 $21,137