348
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MU0001 #05 Y:2022 | 05 | 2022 | Close holes and openings in building such as broken windows | $7,097 | $16,000 | |
| MU0001 #04 Y:2022 | 04 | 2022 | Operate boilers on high fire setting | $2,532 | $146 | |
| MU0001 #03 Y:2022 | 03 | 2022 | Ventilation system to shut off when room is not in use | $2,694 | $600 | |
| MU0001 #02 Y:2022 | 02 | 2022 | Utilize sensors controlling roof and wall openings | $2,156 | $3,960 | |
| MU0001 #01 Y:2022 | 01 | 2022 | Reschedule plant operations or reduce load to avoid peaks | $3,472 | - | |
| CW0122 #06 Y:2022 | 06 | 2022 | Use proper thickness of insulation on building envelope | $42,376 | $188,648 |
n/a
|
| CW0122 #05 Y:2022 | 05 | 2022 | Upgrade controls on compressors | $13,037 | $60,000 |
n/a
|
| CW0122 #04 Y:2022 | 04 | 2022 | Replace existing equipment with more suitable substitutes | $25,171 | $73,990 |
n/a
|
| CW0122 #03 Y:2022 | 03 | 2022 | Convert to robotic painting | $102,960 | $48,500 |
n/a
|
| CW0122 #02 Y:2022 | 02 | 2022 | Recover waste heat from equipment | $3,767 | $400 |
n/a
|
| CW0122 #01 Y:2022 | 01 | 2022 | Treat and reuse rinse waters | $11,974 | $2,500 |
n/a
|
| CW0121 #12 Y:2022 | 12 | 2022 | Contract a wood pallet recycling company | $48,258 | $14,344 | |
| CW0121 #11 Y:2022 | 11 | 2022 | Regrind, reuse, or sell scrap plastic parts | $545 | $90 | |
| CW0121 #10 Y:2022 | 10 | 2022 | Lease / purchase baler; sell cardboard to recycler | $6,639 | $5,500 | |
| CW0121 #09 Y:2022 | 09 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $608 | $165 | |
| CW0121 #08 Y:2022 | 08 | 2022 | Install compressor air intakes in coolest locations | $925 | $810 | |
| CW0121 #07 Y:2022 | 07 | 2022 | Reduce the pressure of compressed air to the minimum required | $1,581 | - | |
| CW0121 #06 Y:2022 | 06 | 2022 | Insulate glazing, walls, ceilings, and roofs | $461 | $517 | |
| CW0121 #05 Y:2022 | 05 | 2022 | Insulate glazing, walls, ceilings, and roofs | $31,088 | $86,330 | |
| CW0121 #04 Y:2022 | 04 | 2022 | Convert to robotic painting | $93,600 | $33,000 |