ITAC Assessment: CW0121
ITAC logo
ITAC Assessment: CW0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Stump grinders, Forestry mulchers
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 400,000
ft2
Annual Production 5,226,553
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,285 2,206,532
kWh
Electricity Demand $37,840 5,398
kW-mo/yr
Electricity Fees $232,075 -
Natural Gas $95,141 17,546
MMBtu
TOTAL YEARLY COSTS $462,341
RECOMMENDED SAVINGS* $204,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,741

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $3,129 $400 $1,332
30,201
kWh
$784
-
kW-mo/yr
$1,013
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,231 $26,058 $14,231
332,693
kWh
- - - -
03 2.1121: Use insulation in furnaces to facilitate heating / cooling $3,746 $265 - - $3,746
-
MMBtu
- -
04 3.2173: Convert to robotic painting $93,600 $33,000 - - - $93,600 -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $31,088 $86,330 - - $31,088
-
MMBtu
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $461 $517 - - $461
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,581 - $1,581
35,852
kWh
- - - -
08 2.4221: Install compressor air intakes in coolest locations $925 $810 $925
20,977
kWh
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $608 $165 $608
13,785
kWh
- - - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $6,639 $5,500 - - - - $6,639
11 3.5212: Regrind, reuse, or sell scrap plastic parts $545 $90 - - - - $545
12 3.5316: Contract a wood pallet recycling company $48,258 $14,344 - - - - $48,258
TOTAL RECOMMENDED $204,811 $167,479 $18,677
433,507
kWh
$784
-
kW-mo/yr
$36,308
-
MMBtu
$93,600 $55,442
TOTAL IMPLEMENTED $109,741 $133,579 $17,752
412,530
kWh
$784
-
kW-mo/yr
$36,308
-
MMBtu
- $54,897
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs