ITAC Assessment: AS0105
ITAC logo
ITAC Assessment: AS0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product COLD DRAWN AL TUBING
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 1,500,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,286 1,827,081
kWh
Natural Gas $137,139 31,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,497

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $157 $12,760 $2,467
37,808
kWh
- $(-2,310.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $75 $147 $109
1,758
kWh
- $(-34.0)
03 2.7135: Install occupancy sensors $546 $900 $546
8,499
kWh
- -
04 2.4314: Use synthetic lubricant $623 $1,230 $310
4,689
kWh
- $313
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,244 $350 $1,244
19,050
kWh
- -
06 2.7233: Use properly designed and sized hvac equipment $1,746 - $1,746
26,671
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $551 $500 - $551
-
MMBtu
-
08 2.2511: Insulate bare equipment $16,707 $2,040 - $16,707
-
MMBtu
-
09 2.2511: Insulate bare equipment $1,707 $820 - $1,707
-
MMBtu
-
10 2.2514: Cover open tanks $5,556 - - $5,556
-
MMBtu
-
TOTAL RECOMMENDED $28,912 $18,747 $6,422
98,475
kWh
$24,521
-
MMBtu
$(-2,031.0)
TOTAL IMPLEMENTED $11,497 $3,447 $3,955
60,667
kWh
$7,263
-
MMBtu
$279
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs