Assessment Year | 1993 |
---|---|
Principal Product | COLD DRAWN AL TUBING |
NAICS |
n/a
|
SIC | 3354: Aluminum Extruded Products |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $119,286 | 1,827,081 |
kWh
|
$0.065 |
Natural Gas | $137,139 | 31,420 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,912 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,497 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $157 | $12,760 |
$2,467
37,808
kWh
|
- | $(-2,310.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $75 | $147 |
$109
1,758
kWh
|
- | $(-34.0) | |
03 | 2.7135: Install occupancy sensors | $546 | $900 |
$546
8,499
kWh
|
- | - | |
04 | 2.4314: Use synthetic lubricant | $623 | $1,230 |
$310
4,689
kWh
|
- | $313 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,244 | $350 |
$1,244
19,050
kWh
|
- | - | |
06 | 2.7233: Use properly designed and sized hvac equipment | $1,746 | - |
$1,746
26,671
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $551 | $500 | - |
$551
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $16,707 | $2,040 | - |
$16,707
-
MMBtu
|
- | |
09 | 2.2511: Insulate bare equipment | $1,707 | $820 | - |
$1,707
-
MMBtu
|
- | |
10 | 2.2514: Cover open tanks | $5,556 | - | - |
$5,556
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $28,912 | $18,747 |
$6,422
98,475
kWh
|
$24,521
-
MMBtu
|
$(-2,031.0) | ||
TOTAL IMPLEMENTED | $11,497 | $3,447 |
$3,955
60,667
kWh
|
$7,263
-
MMBtu
|
$279 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs