Assessment Year | 2022 |
---|---|
Principal Product | Excavators and Vacuum Trucks |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
422,753
ft2
|
Annual Production | 6,507
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $335,641 | 4,389,000 |
kWh
|
$0.076 | |
Natural Gas | $272,862 | 123,540 |
MMBtu
|
$2.21 | |
Waste Disposal Costs | |||||
Water Usage | $9,317 | 686 |
Tgal
|
$13.57 | |
Water Disposal | $9,689 | 686 |
Tgal
|
$14.12 | |
TOTAL YEARLY COSTS | $627,509 | ||||
RECOMMENDED SAVINGS* | $199,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4113: Treat and reuse rinse waters | $11,974 | $2,500 | - | - |
$5,868
-
Tgal
|
$6,106
-
Tgal
|
- | |
02 | 2.2437: Recover waste heat from equipment | $3,767 | $400 |
$299
3,929
kWh
|
$3,469
-
MMBtu
|
- | - | - | |
03 | 3.2173: Convert to robotic painting | $102,960 | $48,500 | - | - | - | - | $102,960 | |
04 | 4.652: Replace existing equipment with more suitable substitutes | $25,171 | $73,990 |
$25,171
331,200
kWh
|
- | - | - | - | |
05 | 2.4224: Upgrade controls on compressors | $13,037 | $60,000 |
$13,037
171,543
kWh
|
- | - | - | - | |
06 | 2.7492: Use proper thickness of insulation on building envelope | $42,376 | $188,648 | - |
$42,376
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $199,286 | $374,038 |
$38,507
506,672
kWh
|
$45,845
-
MMBtu
|
$5,868
-
Tgal
|
$6,106
-
Tgal
|
$102,960 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs