Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Construction machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0340 #08 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $27,531 $5,336
MZ0340 #07 Y:2022 Replace existing chiller with high efficiency model $188,061 $900,000
MZ0340 #06 Y:2022 Use waste heat from hot flue gases to preheat $5,084 $18,000
MZ0340 #05 Y:2022 Meter recycled water (to reduce sewer charges) $6,940 $4,520
MZ0340 #04 Y:2022 Install occupancy sensors $618 $260
MZ0340 #03 Y:2022 Eliminate or reduce compressed air usage $27,810 $3,202
MZ0340 #02 Y:2022 Maintain air filters by cleaning or replacement $3,688 $320
MZ0340 #01 Y:2022 Analyze flue gas for proper air/fuel ratio $3,529 $720
OK1080 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $13,757 $5,295
OK1080 #05 Y:2022 Clean and maintain refrigerant condensers and towers $21,682 $4,810
OK1080 #04 Y:2022 Use solar heat to make electricty $403,296 $1,097,180
OK1080 #03 Y:2022 Eliminate leaks in combustible gas lines $21,187 $25,000
OK1080 #02 Y:2022 Install timers and/or thermostats $22,737 $3,000
OK1080 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $6,094 $6,745
OR0754 #03 Y:2022 Filter and reuse hydraulic oil $13,859 $65,000
OR0754 #02 Y:2022 Use or replace with energy efficient substitutes $1,033 $3,560
OR0754 #01 Y:2022 Eliminate or reduce compressed air usage $4,871 $2,675
WV0623 #16 Y:2022 Establish a predictive maintenance program $313 $1,500
WV0623 #15 Y:2022 Upgrade controls on compressors $1,341 $4,835
WV0623 #14 Y:2022 Develop a repair/replace policy $1,356 $2,300