ITAC Assessment: OK1080
ITAC logo
ITAC Assessment: OK1080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Construction machinery
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 1,085,894
ft2
Annual Production 40,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,246,958 17,745,710
kWh
Electricity Demand $235,840 39,215
kW-mo/yr
Electricity Fees $1,962 -
Natural Gas $706,405 72,443
MMBtu
Waste Disposal Costs
Water Usage $70,409 17,825
Tgal
Water Disposal $44,919 17,825
Tgal
TOTAL YEARLY COSTS $3,306,493
RECOMMENDED SAVINGS* $488,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,626

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,094 $6,745 $6,094
47,986
kWh
- -
02 2.7261: Install timers and/or thermostats $22,737 $3,000 - - $22,737
-
MMBtu
03 2.1134: Eliminate leaks in combustible gas lines $21,187 $25,000 - - $21,187
-
MMBtu
04 2.9114: Use solar heat to make electricty $403,296 $1,097,180 $403,296
3,175,562
kWh
- -
05 2.7211: Clean and maintain refrigerant condensers and towers $21,682 $4,810 $20,359
160,308
kWh
$1,323
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,757 $5,295 $13,757
108,326
kWh
- -
TOTAL RECOMMENDED $488,753 $1,142,030 $443,506
3,492,182
kWh
$1,323
-
kW-mo/yr
$43,924
-
MMBtu
TOTAL IMPLEMENTED $56,626 $35,105 $34,116
268,634
kWh
$1,323
-
kW-mo/yr
$21,187
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs