Assessment Year | 2023 |
---|---|
Principal Product | Highway construction sweepers |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
72,000
ft2
|
Annual Production | 750
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $71,277 | 508,160 |
kWh
|
$0.14 | |
Natural Gas | $45,228 | 10,400 |
MMBtu
|
$4.35 | |
Waste Disposal Costs | |||||
Water Usage | $778 | 338 |
Tgal
|
$2.30 | |
Water Disposal | $685 | 314 |
Tgal
|
$2.18 | |
TOTAL YEARLY COSTS | $117,968 | ||||
RECOMMENDED SAVINGS* | $107,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $101,140 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $18,209 | $91,432 | - |
$18,209
-
MMBtu
|
|
02 | 2.7232: Replace existing hvac unit with high efficiency model | $1,063 | $2,450 |
$1,063
7,596
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,173 | - |
$1,173
8,379
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,963 | $2,426 |
$3,963
28,304
kWh
|
- | |
05 | 2.9114: Use solar heat to make electricty | $71,142 | $168,192 |
$71,142
508,160
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,321 | $11,550 |
$6,321
45,153
kWh
|
- | |
07 | 2.7492: Use proper thickness of insulation on building envelope | $5,468 | $72,450 | - |
$5,468
-
MMBtu
|
|
TOTAL RECOMMENDED | $107,339 | $348,500 |
$83,662
597,592
kWh
|
$23,677
-
MMBtu
|
||
TOTAL IMPLEMENTED | $101,140 | $343,624 |
$77,463
553,313
kWh
|
$23,677
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs