ITAC Assessment: OK1087
ITAC logo
ITAC Assessment: OK1087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Highway construction sweepers
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 72,000
ft2
Annual Production 750
units
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,277 508,160
kWh
Natural Gas $45,228 10,400
MMBtu
Waste Disposal Costs
Water Usage $778 338
Tgal
Water Disposal $685 314
Tgal
TOTAL YEARLY COSTS $117,968
RECOMMENDED SAVINGS* $107,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $101,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $18,209 $91,432 - $18,209
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $1,063 $2,450 $1,063
7,596
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,173 - $1,173
8,379
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,963 $2,426 $3,963
28,304
kWh
-
05 2.9114: Use solar heat to make electricty $71,142 $168,192 $71,142
508,160
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,321 $11,550 $6,321
45,153
kWh
-
07 2.7492: Use proper thickness of insulation on building envelope $5,468 $72,450 - $5,468
-
MMBtu
TOTAL RECOMMENDED $107,339 $348,500 $83,662
597,592
kWh
$23,677
-
MMBtu
TOTAL IMPLEMENTED $101,140 $343,624 $77,463
553,313
kWh
$23,677
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs