ITAC Assessment: AM0549
ITAC logo
ITAC Assessment: AM0549
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Oil and gas well wellheads and subsea trees
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 462,700
ft2
Annual Production 36,000
ton
Production Hrs. Annual 7,120
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,586,268 18,178,638
kWh
Electricity Demand $243,525 35,249
kW-mo/yr
Electricity Fees $12,859 -
Natural Gas $109,118 12,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $176,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $72,200 $85,400 $65,700
738,700
kWh
$6,500
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,300 $1,000 $7,550
84,800
kWh
$750
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $80,000 - $80,000
898,000
kWh
-
04 2.7124: Make a practice of turning off lights when not needed $8,050 - $7,270
72,400
kWh
$780
-
kW-mo/yr
05 2.4239: Eliminate or reduce compressed air usage $5,260 $615 $5,260
59,000
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,220 $1,410 $1,130
12,750
kWh
$90
-
kW-mo/yr
07 2.7145: Install skylights $1,110 $1,410 $1,110
12,500
kWh
-
08 2.4314: Use synthetic lubricant $560 - $510
5,700
kWh
$50
-
kW-mo/yr
TOTAL RECOMMENDED $176,700 $89,835 $168,530
1,883,850
kWh
$8,170
-
kW-mo/yr
TOTAL IMPLEMENTED $95,030 $88,425 $86,910
967,650
kWh
$8,120
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs