Assessment Year | 2004 |
---|---|
Principal Product | die cast toys |
NAICS | 339930: Doll, Toy, and Game Manufacturing |
SIC | 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
60,000
ft2
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,585 | 3,969,284 |
kWh
|
$0.028 |
Electricity Demand | $83,699 | 11,712 |
kW-mo/yr
|
$7.15 |
Electricity Fees | $13,488 | - |
|
- |
Natural Gas | $384,701 | 57,634 |
MMBtu
|
$6.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,530 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $530 | $60 |
$355
12,480
kWh
|
$175
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,722 | $207 |
$1,294
30,516
kWh
|
$428
-
kW-mo/yr
|
|
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $561 | $238 |
$385
13,539
kWh
|
$176
-
kW-mo/yr
|
|
04 | 2.4133: Use most efficient type of electric motors | $389 | $710 |
$260
9,147
kWh
|
$129
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $973 | $1,626 |
$647
22,807
kWh
|
$326
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $885 | $2,484 |
$526
18,533
kWh
|
$359
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $5,060 | $5,325 |
$3,467
107,022
kWh
|
$1,593
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $4,530 | $5,265 |
$3,112
94,542
kWh
|
$1,418
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs