Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

348

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Construction machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0051 #06 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $18,680 $5,175
WM0051 #05 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $4,680 $3,200
WM0051 #04 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $13,050 $225
WM0051 #03 Y:2014 Insulate bare equipment $2,736 $800
WM0051 #02 Y:2014 Install occupancy sensors $15,358 $6,250
WM0051 #01 Y:2014 Utilize higher efficiency lamps and/or ballasts $46,648 $27,260
NC0517 #13 Y:2014 Utilize higher efficiency lamps and/or ballasts $525 $160
NC0517 #12 Y:2014 Develop a repair/replace policy $1,458 $4,256
NC0517 #11 Y:2014 Utilize a less expensive cooling method $10,806 $5,000
NC0517 #10 Y:2014 Reschedule plant operations or reduce load to avoid peaks $2,346 $200
NC0517 #09 Y:2014 Install common header on compressors $9,004 $8,600
NC0517 #08 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $8,395 $100
NC0517 #07 Y:2014 Recover waste heat from equipment $3,941 $5,000
NC0517 #06 Y:2014 Recover waste heat from equipment $5,090 $12,500
NC0517 #05 Y:2014 Recover waste heat from equipment $5,506 $15,200
NC0517 #04 Y:2014 Use closed cycle process to minimize waste water production $6,998 $2,000
NC0517 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $47,226 $215,258
NC0517 #02 Y:2014 Utilize higher efficiency lamps and/or ballasts $74,398 $162,227
NC0517 #01 Y:2014 Reduce illumination to minimum necessary levels $18,930 $1,250
UK1402 #09 Y:2014 Utilize energy-efficient belts and other improved mechanisms $552 $524