Assessment Year | 2014 |
---|---|
Principal Product | Trucks |
NAICS | 333120: Construction Machinery Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | greater than $500 M |
# of Employees | 2,500 |
Plant Area |
1,300,000
ft2
|
Annual Production | 27,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,247,975 | 55,545,600 |
kWh
|
$0.040 |
Electricity Demand | $1,210,965 | 135,594 |
kW-mo/yr
|
$8.93 |
Electricity Fees | $8,533 | - |
|
- |
Natural Gas | $1,448,941 | 247,626 |
MMBtu
|
$5.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $194,623 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $151,295 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $18,930 | $1,250 |
$18,930
467,418
kWh
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $74,398 | $162,227 |
$37,066
915,210
kWh
|
$16,347
-
kW-mo/yr
|
- | - | - | $20,985 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $47,226 | $215,258 |
$32,772
809,190
kWh
|
$14,454
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.4111: Use closed cycle process to minimize waste water production | $6,998 | $2,000 | - | - | - |
$6,998
-
Tgal
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $5,506 | $15,200 | - | - |
$5,506
-
MMBtu
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $5,090 | $12,500 | - | - |
$5,090
-
MMBtu
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $3,941 | $5,000 | - | - |
$3,941
-
MMBtu
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,395 | $100 |
$8,158
201,420
kWh
|
$4,797
-
kW-mo/yr
|
- | - | $(-3,360.0) | $(-1,200.0) | |
09 | 2.4225: Install common header on compressors | $9,004 | $8,600 |
$5,672
140,045
kWh
|
$3,332
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,346 | $200 |
$540
-
kWh
|
$1,806
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.2628: Utilize a less expensive cooling method | $10,806 | $5,000 |
$4,469
110,250
kWh
|
$6,337
-
kW-mo/yr
|
- | - | - | - | |
12 | 2.4151: Develop a repair/replace policy | $1,458 | $4,256 |
$918
22,666
kWh
|
$540
-
kW-mo/yr
|
- | - | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $525 | $160 |
$173
4,275
kWh
|
$53
-
kW-mo/yr
|
- | - | - | $299 | |
TOTAL RECOMMENDED | $194,623 | $431,751 |
$108,698
2,670,474
kWh
|
$47,666
-
kW-mo/yr
|
$14,537
-
MMBtu
|
$6,998
-
Tgal
|
$(-3,360.0) | $20,084 | ||
TOTAL IMPLEMENTED | $151,295 | $379,035 |
$97,466
2,393,238
kWh
|
$37,404
-
kW-mo/yr
|
- | - | $(-3,360.0) | $19,785 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs