Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

251

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Farm machinery and equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0090 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $565 $831
NL0090 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $822 $1,190
NL0090 #04 Y:2023 Use cooling tower or economizer to replace chiller cooling $3,454 $1,764
NL0090 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,382 $4,500
NL0090 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $7,629 $7,670
NL0090 #01 Y:2023 Improve air circulation with destratification fans / other methods $10,602 $19,848
MZ0348 #07 Y:2023 Re-size charging openings or add movable cover or door $2,203 $4,132
MZ0348 #06 Y:2023 Reduce the pressure of compressed air to the minimum required $2,751 $5,386
MZ0348 #05 Y:2023 Install occupancy sensors $3,429 $830
MZ0348 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $4,917 $1,548
MZ0348 #03 Y:2023 Eliminate or reduce compressed air usage $5,900 $2,660
MZ0348 #02 Y:2023 Reschedule plant operations or reduce load to avoid peaks $7,209 $3,330
MZ0348 #01 Y:2023 Optimize plant power factor $13,016 $3,000
SD0631 #08 Y:2023 Install compressor air intakes in coolest locations $1,593 $4,339
SD0631 #07 Y:2023 Insulate bare equipment $1,509 $4,973
SD0631 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $928 $2,934
SD0631 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $10,208 $16,000
SD0631 #04 Y:2023 Install direct acting units in place of compressed air pressure system in safety system $3,553 $3,535
SD0631 #03 Y:2023 Use photocell controls $754 $1,124
SD0631 #02 Y:2023 Use battery storage for demand control $15,108 $70,650