ITAC Assessment: NL0141
ITAC logo
ITAC Assessment: NL0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Farm Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 56,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 5,096
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,868 1,019,600
kWh
Natural Gas $21,141 2,632
MMBtu
Waste Disposal Costs
Water Usage $2,450 332
Tgal
Water Disposal $1,598 332
Tgal
TOTAL YEARLY COSTS $112,057
RECOMMENDED SAVINGS* $7,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $4,281 $652 $(-201.0)
(-2,366)
kWh
$4,482
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,001 $562 $2,001
23,598
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $316 $740 $316
3,721
kWh
-
04 2.7135: Install occupancy sensors $369 $488 $369
4,336
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $269 $783 $269
3,163
kWh
-
06 2.2511: Insulate bare equipment $42 $109 $42
498
kWh
-
TOTAL RECOMMENDED $7,278 $3,334 $2,796
32,950
kWh
$4,482
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs