Assessment Year 2017
Principal Product Repaired Motors
NAICS 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
SIC 7699: Repair Shops and Related Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 49,500
ft2
Annual Production 50,000
units
Production Hrs. Annual 8,472
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,701 831,600
kWh
Electricity Demand $30,584 2,324
kW-mo/yr
Electricity Fees $34,014 -
Natural Gas $32,386 5,185
MMBtu
TOTAL YEARLY COSTS $148,685
RECOMMENDED SAVINGS* $33,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,803 $12,299 $12,921
208,411
kWh
$3,882
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $1,073 $263 $1,073
17,301
kWh
- -
03 2.7124: Make a practice of turning off lights when not needed $543 - $543
8,754
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,482 $2,189 $2,679
43,207
kWh
$803
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,142 - $879
14,183
kWh
$263
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $394 $683 $394
6,361
kWh
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $4,530 $1,500 - - $4,530
-
MMBtu
08 3.1161: Eliminate/reduce an operation $3,032 - $2,006
32,349
kWh
$1,026
-
kW-mo/yr
-
09 2.6212: Turn off equipment during breaks, reduce operating time $309 - $309
4,987
kWh
- -
10 2.7224: Reduce space conditioning during non-working hours $1,207 - $402
6,480
kWh
- $805
-
MMBtu
11 2.7224: Reduce space conditioning during non-working hours $964 - $964
15,552
kWh
- -
TOTAL RECOMMENDED $33,479 $16,934 $22,170
357,585
kWh
$5,974
-
kW-mo/yr
$5,335
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs