Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Tractor Attatchments
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 530,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 7,350
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $670,780 7,869,685
kWh
Electricity Demand $83,684 19,554
kW-mo/yr
Electricity Fees $39,707 -
Natural Gas $870,140 84,180
MMBtu
TOTAL YEARLY COSTS $1,664,311
RECOMMENDED SAVINGS* $163,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $362 $428 $318
3,727
kWh
$26
-
kW-mo/yr
$18 -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,891 $11,280 $2,545
29,870
kWh
$201
-
kW-mo/yr
$145 -
03 2.7135: Install occupancy sensors $13,768 $1,357 $13,080
153,527
kWh
- $688 -
04 2.7135: Install occupancy sensors $4,983 $1,507 $4,734
55,566
kWh
- $249 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,043 $25,158 $25,940
304,463
kWh
$2,602
-
kW-mo/yr
$1,501 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $12,379 $250 $10,455
122,711
kWh
$1,305
-
kW-mo/yr
$619 -
07 2.4226: Use / purchase optimum sized compressor $54,343 $127,816 $51,627
605,955
kWh
- $2,716 -
08 2.7261: Install timers and/or thermostats $1,137 $1,281 $1,080
12,671
kWh
- $57 -
09 2.7232: Replace existing hvac unit with high efficiency model $16,188 $13,173 $13,611
159,748
kWh
$1,768
-
kW-mo/yr
$809 -
10 2.7492: Use proper thickness of insulation on building envelope $20,881 $16,645 $19,838
232,843
kWh
- $1,043 -
11 2.2511: Insulate bare equipment $6,411 $14,900 - - - $6,411
-
MMBtu
TOTAL RECOMMENDED $163,386 $213,795 $143,228
1,681,081
kWh
$5,902
-
kW-mo/yr
$7,845 $6,411
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs