| Assessment Year | 2026 |
|---|---|
| Principal Product | Fertilizer Tenders |
| NAICS | 333111: Farm Machinery and Equipment Manufacturing |
| SIC | 3523: Farm Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
74,769
ft2
|
| Annual Production | 150
units
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $46,987 | 554,042 |
kWh
|
$0.085 | |
| Electricity Demand | $18,709 | 1,590 |
kW-mo/yr
|
$11.77 | |
| Electricity Fees | $4,336 | - |
|
- | |
| Natural Gas | $22,763 | 2,963 |
MMBtu
|
$7.68 | |
| LPG | $5,027 | 173 |
MMBtu
|
$29.07 | |
| Other Gas | $1,502 | 1 |
MMBtu
|
$1,502.48 | |
| Waste Disposal Costs | |||||
| Water Usage | $1,322 | 461 |
Tgal
|
$2.87 | |
| Water Disposal | $848 | 341 |
Tgal
|
$2.49 | |
| Other Liquid (non-haz) | $3,013 | 1 |
gal
|
$3,012.91 | |
| TOTAL YEARLY COSTS | $104,508 | ||||
| RECOMMENDED SAVINGS* | $44,131 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $14,978 | $34,292 |
$(-203.7)
(-2,396)
kWh
|
$(-169.5)
-
kW-mo/yr
|
- |
$1,591
-
MMBtu
|
$13,760 | - | - | |
| 02 | 2.7234: Use heat pump for space conditioning | $13,674 | $42,175 |
$7,347
86,432
kWh
|
$6,328
-
kW-mo/yr
|
- | - | - | - | - | |
| 03 | 4.211: Consider use / purchase of bulk materials where possible | $7,042 | $50,000 | - | - | - | - | - | $366 | $6,676 | |
| 04 | 2.8121: Apply for tax-free status for energy purchases | $4,336 | $348 | - | - | $4,336 | - | - | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,750 | $7,443 |
$1,062
12,493
kWh
|
$685
-
kW-mo/yr
|
- | - | $1,003 | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $514 | $681 |
$514
6,045
kWh
|
- | - | - | - | - | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $421 | $500 |
$869
10,225
kWh
|
- | - | - | $(-348.0) | $(-100.0) | - | |
| 08 | 2.7135: Install occupancy sensors | $416 | $999 |
$255
2,995
kWh
|
- | - | - | $162 | - | - | |
| TOTAL RECOMMENDED | $44,131 | $136,438 |
$9,843
115,794
kWh
|
$6,843
-
kW-mo/yr
|
$4,336 |
$1,591
-
MMBtu
|
$14,577 | $266 | $6,676 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | LPG Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs