Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Fertilizer Tenders
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 74,769
ft2
Annual Production 150
units
Production Hrs. Annual 2,550
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,987 554,042
kWh
Electricity Demand $18,709 1,590
kW-mo/yr
Electricity Fees $4,336 -
Natural Gas $22,763 2,963
MMBtu
LPG $5,027 173
MMBtu
Other Gas $1,502 1
MMBtu
Waste Disposal Costs
Water Usage $1,322 461
Tgal
Water Disposal $848 341
Tgal
Other Liquid (non-haz) $3,013 1
gal
TOTAL YEARLY COSTS $104,508
RECOMMENDED SAVINGS* $44,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $14,978 $34,292 $(-203.7)
(-2,396)
kWh
$(-169.5)
-
kW-mo/yr
- $1,591
-
MMBtu
$13,760 - -
02 2.7234: Use heat pump for space conditioning $13,674 $42,175 $7,347
86,432
kWh
$6,328
-
kW-mo/yr
- - - - -
03 4.211: Consider use / purchase of bulk materials where possible $7,042 $50,000 - - - - - $366 $6,676
04 2.8121: Apply for tax-free status for energy purchases $4,336 $348 - - $4,336 - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,750 $7,443 $1,062
12,493
kWh
$685
-
kW-mo/yr
- - $1,003 - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $514 $681 $514
6,045
kWh
- - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $421 $500 $869
10,225
kWh
- - - $(-348.0) $(-100.0) -
08 2.7135: Install occupancy sensors $416 $999 $255
2,995
kWh
- - - $162 - -
TOTAL RECOMMENDED $44,131 $136,438 $9,843
115,794
kWh
$6,843
-
kW-mo/yr
$4,336 $1,591
-
MMBtu
$14,577 $266 $6,676
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs