Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Small arms ammunition manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0184 #06 Y:2021 Reduce the pressure of compressed air to the minimum required $546 $550
UU0184 #05 Y:2021 Lower temperature during the winter season and vice-versa $731 $2,000
UU0184 #04 Y:2021 Turn off equipment when not in use $1,530 $500
UU0184 #03 Y:2021 Optimize plant power factor $2,375 $6,744
UU0184 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $2,459 $2,700
UU0184 #01 Y:2021 Utilize other methods to remove contaminants $26,453 $92,586
AM0738 #05 Y:2017 Insulate bare equipment $10,990 $9,760
AM0738 #04 Y:2017 Increase amount of condensate returned $10,870 $19,400
AM0738 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $10,870 $3,000
AM0738 #02 Y:2017 Utilize higher efficiency lamps and/or ballasts $11,030 $41,200
AM0738 #01 Y:2017 Optimize plant power factor $23,860 $39,900
SU0382 #08 Y:2015 Install vinyl strip / high speed / air curtain doors $68 $324
SU0382 #07 Y:2015 Install occupancy sensors $394 $1,415
SU0382 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $461 $1,590
SU0382 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $220 $624
SU0382 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $4,679 $10,400
SU0382 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $394 $320
SU0382 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $7,982 $1,901
SU0382 #01 Y:2015 Use synthetic lubricant $362 -
BS0048 #10 Y:2014 Utilize energy-efficient belts and other improved mechanisms $305 $20