Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

121

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other metal valve and pipe fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2406 #06 Y:2024 Install vinyl strip / high speed / air curtain doors $1,732 $14,382
UW2406 #05 Y:2024 Use photocell controls $913 $1,908
UW2406 #04 Y:2024 Use / purchase optimum sized compressor $234,799 $127,331
UW2406 #03 Y:2024 Install desiccant humidity control system $29,790 $91,000
UW2406 #02 Y:2024 Install occupancy sensors $2,204 $4,593
UW2406 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $25,580 $25,000
AM0909 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $360 $970
AM0909 #06 Y:2024 Install timers on light switches in little used areas $385 $680
AM0909 #05 Y:2024 Install occupancy sensors $1,070 $2,100
AM0909 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,170 $550
AM0909 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $3,600 $8,190
AM0909 #02 Y:2024 Re-size charging openings or add movable cover or door $16,800 $21,600
AM0909 #01 Y:2024 Apply for tax-free status for energy purchases $30,000 $10,000
MI0401 #07 Y:2022 Optimize plant power factor $2,280 $2,998
MI0401 #06 Y:2022 Eliminate or reduce compressed air usage $4,022 $2,050
MI0401 #05 Y:2022 Meter waste water $3,900 $900
MI0401 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $5,273 $1,930
MI0401 #03 Y:2022 Clean or color roof to reduce solar load $7,485 $25,433
MI0401 #02 Y:2022 Upgrade controls on compressors $8,603 $24,100
MI0401 #01 Y:2022 Lower temperature during the winter season and vice-versa $15,026 $580