121
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Other metal valve and pipe fitting manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UW2406 #06 Y:2024 | 06 | 2024 | Install vinyl strip / high speed / air curtain doors | $1,732 | $14,382 |
n/a
|
UW2406 #05 Y:2024 | 05 | 2024 | Use photocell controls | $913 | $1,908 |
n/a
|
UW2406 #04 Y:2024 | 04 | 2024 | Use / purchase optimum sized compressor | $234,799 | $127,331 |
n/a
|
UW2406 #03 Y:2024 | 03 | 2024 | Install desiccant humidity control system | $29,790 | $91,000 |
n/a
|
UW2406 #02 Y:2024 | 02 | 2024 | Install occupancy sensors | $2,204 | $4,593 |
n/a
|
UW2406 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $25,580 | $25,000 |
n/a
|
AM0909 #07 Y:2024 | 07 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $360 | $970 |
n/a
|
AM0909 #06 Y:2024 | 06 | 2024 | Install timers on light switches in little used areas | $385 | $680 |
n/a
|
AM0909 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $1,070 | $2,100 |
n/a
|
AM0909 #04 Y:2024 | 04 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,170 | $550 |
n/a
|
AM0909 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $3,600 | $8,190 |
n/a
|
AM0909 #02 Y:2024 | 02 | 2024 | Re-size charging openings or add movable cover or door | $16,800 | $21,600 |
n/a
|
AM0909 #01 Y:2024 | 01 | 2024 | Apply for tax-free status for energy purchases | $30,000 | $10,000 |
n/a
|
MI0401 #07 Y:2022 | 07 | 2022 | Optimize plant power factor | $2,280 | $2,998 | |
MI0401 #06 Y:2022 | 06 | 2022 | Eliminate or reduce compressed air usage | $4,022 | $2,050 | |
MI0401 #05 Y:2022 | 05 | 2022 | Meter waste water | $3,900 | $900 | |
MI0401 #04 Y:2022 | 04 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,273 | $1,930 | |
MI0401 #03 Y:2022 | 03 | 2022 | Clean or color roof to reduce solar load | $7,485 | $25,433 | |
MI0401 #02 Y:2022 | 02 | 2022 | Upgrade controls on compressors | $8,603 | $24,100 | |
MI0401 #01 Y:2022 | 01 | 2022 | Lower temperature during the winter season and vice-versa | $15,026 | $580 |