ITAC Assessment: UW2406
ITAC logo
ITAC Assessment: UW2406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Other Metal Valve and Pipe Fitting Manufacturing
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 508,900
ft2
Annual Production 23,000,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,067,720 18,241,589
kWh
Electricity Demand $365,215 76,740
kW-mo/yr
Electricity Fees $86,325 -
Natural Gas $129,490 13,163
MMBtu
TOTAL YEARLY COSTS $1,648,750
RECOMMENDED SAVINGS* $295,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,580 $25,000 $21,537
386,160
kWh
$4,043
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $2,204 $4,593 $2,204
37,674
kWh
- -
03 2.7273: Install desiccant humidity control system $29,790 $91,000 $(-371.0)
(-6,336)
kWh
- $30,161
-
MMBtu
04 2.4226: Use / purchase optimum sized compressor $234,799 $127,331 $210,690
3,601,531
kWh
$24,109
-
kW-mo/yr
-
05 2.7134: Use photocell controls $913 $1,908 $913
15,600
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $1,732 $14,382 $1,732
29,600
kWh
- -
TOTAL RECOMMENDED $295,018 $264,214 $236,705
4,064,229
kWh
$28,152
-
kW-mo/yr
$30,161
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs