Assessment Year | 2024 |
---|---|
Principal Product | Other Metal Valve and Pipe Fitting Manufacturing |
NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
508,900
ft2
|
Annual Production | 23,000,000
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,067,720 | 18,241,589 |
kWh
|
$0.059 |
Electricity Demand | $365,215 | 76,740 |
kW-mo/yr
|
$4.76 |
Electricity Fees | $86,325 | - |
|
- |
Natural Gas | $129,490 | 13,163 |
MMBtu
|
$9.84 |
TOTAL YEARLY COSTS | $1,648,750 | |||
RECOMMENDED SAVINGS* | $295,018 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,580 | $25,000 |
$21,537
386,160
kWh
|
$4,043
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $2,204 | $4,593 |
$2,204
37,674
kWh
|
- | - | |
03 | 2.7273: Install desiccant humidity control system | $29,790 | $91,000 |
$(-371.0)
(-6,336)
kWh
|
- |
$30,161
-
MMBtu
|
|
04 | 2.4226: Use / purchase optimum sized compressor | $234,799 | $127,331 |
$210,690
3,601,531
kWh
|
$24,109
-
kW-mo/yr
|
- | |
05 | 2.7134: Use photocell controls | $913 | $1,908 |
$913
15,600
kWh
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,732 | $14,382 |
$1,732
29,600
kWh
|
- | - | |
TOTAL RECOMMENDED | $295,018 | $264,214 |
$236,705
4,064,229
kWh
|
$28,152
-
kW-mo/yr
|
$30,161
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs