ITAC Assessment: OK0522
ITAC logo
ITAC Assessment: OK0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product pipeline maintanance equipment
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 125,000
ft2
Annual Production 35,014,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,530 3,778,429
kWh
Electricity Demand $89,688 9,017
kW-mo/yr
Electricity Fees $876 -
Natural Gas $54,449 17,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.4114: Replace city water with recycled water via cooling tower $844 $2,845 $(-159.0)
(-1,465)
kWh
- $1,003
-
Tgal
- - -
02 3.1191: Change procedures / equipment / operating conditions $1,918 $3,500 $(-57.0)
(-2,052)
kWh
- - $2,695
-
lb
$(-720.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $103 $200 $203
7,034
kWh
- - - $(-100.0) -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $(-70.0) $386 $57
2,052
kWh
$26
-
kW-mo/yr
- - $(-153.0) -
05 2.4221: Install compressor air intakes in coolest locations $282 $880 $282
9,672
kWh
- - - - -
06 3.5311: Recover and reuse waste material $54,126 $4,480 - - - $(-558.0)
-
lb
- $54,684
07 3.5316: Contract a wood pallet recycling company $198 - - - - $198
-
lb
- -
08 4.452: Eliminate shift $10,400 $200 - - - - $10,400 -
09 2.3191: Use demand controller or load shedder $4,662 $15,500 - $4,662
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $72,463 $27,991 $326
15,241
kWh
$4,688
-
kW-mo/yr
$1,003
-
Tgal
$2,335
-
lb
$9,427 $54,684
TOTAL IMPLEMENTED $13,195 $7,131 $44
5,569
kWh
$26
-
kW-mo/yr
$1,003
-
Tgal
$2,695
-
lb
$9,427 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs