ITAC Assessment: AM0909
ITAC logo
ITAC Assessment: AM0909
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Commercial grade fountain equipment
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 60,000
ft2
Annual Production 7,000
units
Production Hrs. Annual 2,241
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,639 738,033
kWh
Electricity Demand $12,086 2,417
kW-mo/yr
Electricity Fees $8,220 -
Other Gas $29,175 1,011
MMBtu
TOTAL YEARLY COSTS $107,120
RECOMMENDED SAVINGS* $54,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $30,000 $10,000 - - $6,000 - - $24,000
02 2.2531: Re-size charging openings or add movable cover or door $16,800 $21,600 - - - $16,800
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,600 $8,190 $2,500
32,500
kWh
$850
-
kW-mo/yr
- - $250 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,170 $550 $1,600
21,300
kWh
$570
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $1,070 $2,100 $1,070
13,700
kWh
- - - - -
06 2.7132: Install timers on light switches in little used areas $385 $680 $330
4,200
kWh
$55
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $360 $970 $360
4,600
kWh
- - - - -
TOTAL RECOMMENDED $54,385 $44,090 $5,860
76,300
kWh
$1,475
-
kW-mo/yr
$6,000 $16,800
-
MMBtu
$250 $24,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs