Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cartridge valves and Manifold Assemblies
NAICS 332919: Other Metal Valve and Pipe Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $50
M
to 100
M
# of Employees 267
Plant Area 55,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,292 2,964,636
kWh
Electricity Demand $90,555 13,704
kW-mo/yr
Electricity Fees $51,118 -
Waste Disposal Costs
Water Disposal $7,800 1,200
Tgal
TOTAL YEARLY COSTS $298,765
RECOMMENDED SAVINGS* $46,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.7221: Lower temperature during the winter season and vice-versa $15,026 $580 $12,719
254,374
kWh
$2,307
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $8,603 $24,100 $7,281
145,620
kWh
$1,322
-
kW-mo/yr
-
03 2.7425: Clean or color roof to reduce solar load $7,485 $25,433 $4,035
80,700
kWh
$3,450
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,273 $1,930 $2,774
55,478
kWh
$2,499
-
kW-mo/yr
-
05 3.4155: Meter waste water $3,900 $900 - - $3,900
-
Tgal
06 2.4239: Eliminate or reduce compressed air usage $4,022 $2,050 $3,163
63,256
kWh
$859
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $2,280 $2,998 - $2,280
-
kW-mo/yr
-
TOTAL RECOMMENDED $46,589 $57,991 $29,972
599,428
kWh
$12,717
-
kW-mo/yr
$3,900
-
Tgal
TOTAL IMPLEMENTED $27,784 $27,943 $19,528
390,552
kWh
$8,256
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs