ITAC Assessment: BD0417
ITAC logo
ITAC Assessment: BD0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Aerospace parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 135,000
ft2
Annual Production 18,500
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,084 3,020,495
kWh
Electricity Demand $35,274 6,810
kW-mo/yr
Electricity Fees $3,116 -
Natural Gas $22,010 1,779
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,802 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $661 $966 $420
7,828
kWh
$240
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $889 $10 $750
13,965
kWh
$139
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,168 $300 $985
18,350
kWh
$183
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $38,469 $5,000 - - $38,469
-
MMBtu
05 2.4314: Use synthetic lubricant $1,301 $500 $1,098
20,448
kWh
$203
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $1,124 $375 $918
17,092
kWh
$206
-
kW-mo/yr
-
07 2.7134: Use photocell controls $190 $50 $144
2,673
kWh
$46
-
kW-mo/yr
-
TOTAL RECOMMENDED $43,802 $7,201 $4,315
80,357
kWh
$1,017
-
kW-mo/yr
$38,469
-
MMBtu
TOTAL IMPLEMENTED $40,254 $6,341 $1,338
24,920
kWh
$446
-
kW-mo/yr
$38,469
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs