Assessment Year | 2017 |
---|---|
Principal Product | Automotive Acoustical Control Products |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 347 |
Plant Area |
335,000
ft2
|
Annual Production | 6,500,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $821,662 | 15,539,760 |
kWh
|
$0.053 |
Electricity Demand | $59,256 | 2,469 |
kW-mo/yr
|
$24.00 |
Electricity Fees | $0.1 | - |
|
- |
Natural Gas | $235,935 | 69,903 |
MMBtu
|
$3.38 |
TOTAL YEARLY COSTS | $1,116,853 | |||
RECOMMENDED SAVINGS* | $943,894 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $196,199 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $7,465 | $3,408 | - | - |
$7,465
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $5,938 | $3,125 | - | - |
$5,938
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $881 | $60 | - | - |
$881
-
MMBtu
|
- | |
04 | 2.2163: Use minimum steam operating pressure | $457 | - | - | - |
$457
-
MMBtu
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $49 | $6 | - | - |
$49
-
MMBtu
|
- | |
06 | 2.1224: Replace boiler | $183,000 | $30,000 | - | - | - | $183,000 | |
07 | 2.4133: Use most efficient type of electric motors | $32,126 | $16,175 |
$16,254
275,487
kWh
|
$15,872
-
kW-mo/yr
|
- | - | |
08 | 2.4224: Upgrade controls on compressors | $3,210 | $2,555 |
$2,030
34,440
kWh
|
$1,180
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,417 | $5,650 |
$5,076
86,028
kWh
|
$3,341
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,782 | $11,163 |
$4,768
80,810
kWh
|
$14
-
kW-mo/yr
|
- | - | |
11 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $697,569 | $2,619,820 |
$697,569
13,478,970
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $943,894 | $2,691,962 |
$725,697
13,955,735
kWh
|
$20,407
-
kW-mo/yr
|
$14,790
-
MMBtu
|
$183,000 | ||
TOTAL IMPLEMENTED | $196,199 | $46,813 |
$9,844
166,838
kWh
|
$3,355
-
kW-mo/yr
|
- | $183,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs