Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

291

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fluid power valve and hose fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MU0083 #12 Y:2026 Pay bills on time to avoid late fees $1,478 -
MU0083 #11 Y:2026 Use proper thickness of insulation on building envelope $187 $556
MU0083 #10 Y:2026 Insulate glazing, walls, ceilings, and roofs $2,211 $4,353
MU0083 #09 Y:2026 Close holes and openings in building such as broken windows $56 $113
MU0083 #08 Y:2026 Install timers and/or thermostats $5,069 $1,095
MU0083 #07 Y:2026 Lower temperature during the winter season and vice-versa $14,336 -
MU0083 #06 Y:2026 Reschedule and rearrange multiple-source heating systems $4,945 -
MU0083 #05 Y:2026 Install occupancy sensors $233 $1,209
MU0083 #04 Y:2026 Eliminate or reduce compressed air usage $1,914 $1,793
MU0083 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $1,057 -
MU0083 #02 Y:2026 Reduce space conditioning during non-working hours $15,130 -
MU0083 #01 Y:2026 Recover heat from exhausted steam, hot air or hot water $23,488 $132,000
OK1158 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,121 $19,503
OK1158 #05 Y:2025 Optimize plant power factor $2,728 $10,239
OK1158 #04 Y:2025 Conserve energy by efficient use of vending machines $715 $560
OK1158 #03 Y:2025 Use computer programs to optimize hvac performance $38,968 $113,400
OK1158 #02 Y:2025 Clean and maintain refrigerant condensers and towers $22,291 $11,690
OK1158 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,824 $21,492
OR0812 #03 Y:2025 Use solar heat to make electricty $25,841 $345,694
OR0812 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,333 $5,919