ITAC Assessment: NL0105
ITAC logo
ITAC Assessment: NL0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Hydraulics
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 109,000
ft2
Annual Production 1,040,000
units
Production Hrs. Annual 2,288
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,209 809,088
kWh
Electricity Demand $28,961 3,968
kW-mo/yr
Natural Gas $32,605 4,557
MMBtu
Other Gas $4,660 1
MMBtu
Waste Disposal Costs
Water Usage $712 281
Tgal
Water Disposal $2,997 281
Tgal
Other Liquid (non-haz) $5,287 1
gal
TOTAL YEARLY COSTS $129,431
RECOMMENDED SAVINGS* $111,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.4321: Upgrade obsolete equipment $76,412 $216,424 $42
628
kWh
- - $4,325 $13,795 $58,250
02 2.4321: Upgrade obsolete equipment $22,584 $145,801 $396
5,907
kWh
- - $1,872 $20,316 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,009 $9,991 $6,992
104,360
kWh
$2,770
-
kW-mo/yr
- $247 - -
04 2.8114: Change rate schedules or other changes in utility service $2,197 $40 - $2,197
-
kW-mo/yr
- - - -
05 3.4155: Meter waste water $794 $950 - - $794
-
Tgal
- - -
TOTAL RECOMMENDED $111,996 $373,206 $7,430
110,895
kWh
$4,967
-
kW-mo/yr
$794
-
Tgal
$6,444 $34,111 $58,250
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs