Assessment Year | 2025 |
---|---|
Principal Product | Hydraulics |
NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
109,000
ft2
|
Annual Production | 1,040,000
units
|
Production Hrs. Annual | 2,288
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $54,209 | 809,088 |
kWh
|
$0.067 | |
Electricity Demand | $28,961 | 3,968 |
kW-mo/yr
|
$7.30 | |
Natural Gas | $32,605 | 4,557 |
MMBtu
|
$7.16 | |
Other Gas | $4,660 | 1 |
MMBtu
|
$4,660.00 | |
Waste Disposal Costs | |||||
Water Usage | $712 | 281 |
Tgal
|
$2.53 | |
Water Disposal | $2,997 | 281 |
Tgal
|
$10.66 | |
Other Liquid (non-haz) | $5,287 | 1 |
gal
|
$5,287.42 | |
TOTAL YEARLY COSTS | $129,431 | ||||
RECOMMENDED SAVINGS* | $111,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4321: Upgrade obsolete equipment | $76,412 | $216,424 |
$42
628
kWh
|
- | - | $4,325 | $13,795 | $58,250 | |
02 | 2.4321: Upgrade obsolete equipment | $22,584 | $145,801 |
$396
5,907
kWh
|
- | - | $1,872 | $20,316 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,009 | $9,991 |
$6,992
104,360
kWh
|
$2,770
-
kW-mo/yr
|
- | $247 | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $2,197 | $40 | - |
$2,197
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.4155: Meter waste water | $794 | $950 | - | - |
$794
-
Tgal
|
- | - | - | |
TOTAL RECOMMENDED | $111,996 | $373,206 |
$7,430
110,895
kWh
|
$4,967
-
kW-mo/yr
|
$794
-
Tgal
|
$6,444 | $34,111 | $58,250 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs