| Assessment Year | 2018 |
|---|---|
| Principal Product | Hydraulic Coupling Components |
| NAICS | 332710: Machine Shops |
| SIC | 3451: Screw Machine Products |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
53,750
ft2
|
| Annual Production | 14,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Nebraska |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $199,347 | 2,556,140 |
kWh
|
$0.078 | |
| Electricity Demand | $161,135 | 9,502 |
kW-mo/yr
|
$16.96 | |
| Electricity Fees | $11,278 | - |
|
- | |
| Natural Gas | $44,097 | 4,319 |
MMBtu
|
$10.21 | |
| Waste Disposal Costs | |||||
| Water Usage | $6,730 | 4,428 |
Tgal
|
$1.52 | |
| Water Disposal | $5,220 | 4,428 |
Tgal
|
$1.18 | |
| TOTAL YEARLY COSTS | $427,807 | ||||
| RECOMMENDED SAVINGS* | $15,147 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $7,953 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $7,194 | $15,000 |
$(-183.0)
(-3,102)
kWh
|
$(-123.0)
-
kW-mo/yr
|
- | $7,500 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,388 | $45,275 |
$1,767
29,952
kWh
|
$1,466
-
kW-mo/yr
|
$1,155 | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,651 | $1,575 |
$2,651
44,935
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $914 | $1,600 |
$1,064
18,026
kWh
|
- | $(-150.0) | - | |
| TOTAL RECOMMENDED | $15,147 | $63,450 |
$5,299
89,811
kWh
|
$1,343
-
kW-mo/yr
|
$1,005 | $7,500 | ||
| TOTAL IMPLEMENTED | $7,953 | $48,450 |
$5,482
92,913
kWh
|
$1,466
-
kW-mo/yr
|
$1,005 | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs