Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

805

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0351 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,055 $1,500
TT0351 #06 Y:2025 Eliminate or reduce compressed air usage $1,162 $3,300
TT0351 #05 Y:2025 Replace existing hvac unit with high efficiency model $2,185 $12,000
TT0351 #04 Y:2025 Improve lubrication practices $2,776 $4,213
TT0351 #03 Y:2025 Use radiant heater for spot heating $3,466 $20,800
TT0351 #02 Y:2025 Recover heat from exhausted steam, hot air or hot water $4,582 $1,265
TT0351 #01 Y:2025 Use solar heat to make electricty $35,136 $290,400
OK1158 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,121 $19,503
OK1158 #05 Y:2025 Optimize plant power factor $2,728 $10,239
OK1158 #04 Y:2025 Conserve energy by efficient use of vending machines $715 $560
OK1158 #03 Y:2025 Use computer programs to optimize hvac performance $38,968 $113,400
OK1158 #02 Y:2025 Clean and maintain refrigerant condensers and towers $22,291 $11,690
OK1158 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,824 $21,492
OR0812 #03 Y:2025 Use solar heat to make electricty $25,841 $345,694
OR0812 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,333 $5,919
OR0812 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $3,031 $373
MZ0377 #08 Y:2025 Eliminate or reduce compressed air usage $1,503 $3,660
MZ0377 #07 Y:2025 Meter recycled water (to reduce sewer charges) $31,698 $9,040
MZ0377 #06 Y:2025 Use or replace with energy efficient substitutes $26,142 $43,500
MZ0377 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $769 $200