| Assessment Year | 2026 |
|---|---|
| Principal Product | Hydraulic Components |
| NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
| SIC | 3492: Fluid Power Valves and Hose Fittings |
| Sales Range | $5 M to 10M |
| # of Employees | 16 |
| Plant Area |
20,000
ft2
|
| Annual Production | 3,500
units
|
| Production Hrs. Annual | 3,213
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $56,795 | 299,760 |
kWh
|
$0.19 |
| Electricity Demand | $19,690 | 1,236 |
kW-mo/yr
|
$15.94 |
| Electricity Fees | $9,927 | - |
|
- |
| TOTAL YEARLY COSTS | $86,412 | |||
| RECOMMENDED SAVINGS* | $130,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7233: Use properly designed and sized hvac equipment | $3,373 | $25,000 |
$3,172
16,737
kWh
|
$201
-
kW-mo/yr
|
- | |
| 02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $68,878 | $7,600 |
$68,878
363,473
kWh
|
- | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,845 | - | - | - | $9,845 | |
| 04 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $2,927 | $3,600 |
$2,927
15,446
kWh
|
- | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $263 | $847 |
$200
1,056
kWh
|
$63
-
kW-mo/yr
|
- | |
| 06 | 2.7134: Use photocell controls | $9,537 | $8,783 |
$8,553
45,133
kWh
|
$985
-
kW-mo/yr
|
- | |
| 07 | 2.9114: Use solar heat to make electricty | $10,872 | $22,920 |
$8,022
42,330
kWh
|
$2,851
-
kW-mo/yr
|
- | |
| 08 | 2.3141: Use battery storage for demand control | $14,353 | $3,034 |
$(-4,400.2)
(-23,220)
kWh
|
$18,753
-
kW-mo/yr
|
- | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,791 | - |
$7,436
39,241
kWh
|
$2,355
-
kW-mo/yr
|
- | |
| 10 | 2.4221: Install compressor air intakes in coolest locations | $1,072 | $2,463 |
$619
3,266
kWh
|
$453
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $130,910 | $74,247 |
$95,406
503,462
kWh
|
$25,659
-
kW-mo/yr
|
$9,845 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs