ITAC Assessment: LL0287
ITAC logo
ITAC Assessment: LL0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Sugar Mill Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 45,000
ft2
Annual Production 75
pieces
Production Hrs. Annual 5,356
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,756 1,386,952
kWh
Electricity Demand $45,301 5,393
kW-mo/yr
Electricity Fees $5,085 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,840 $30 $3,717
46,615
kWh
- $123
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,742 $1,120 $3,622
45,429
kWh
- $120
03 2.7111: Reduce illumination to minimum necessary levels $2,155 $456 $1,406
17,635
kWh
$680
-
kW-mo/yr
$69
04 2.7135: Install occupancy sensors $1,821 $60 $594
7,456
kWh
$1,169
-
kW-mo/yr
$58
05 2.4239: Eliminate or reduce compressed air usage $641 $433 $621
7,792
kWh
- $20
06 2.7224: Reduce space conditioning during non-working hours $543 $330 $526
6,593
kWh
- $17
07 2.6211: Conserve energy by efficient use of vending machines $494 $478 $419
5,256
kWh
$59
-
kW-mo/yr
$16
08 2.7134: Use photocell controls $263 $60 $187
2,345
kWh
$67
-
kW-mo/yr
$9
TOTAL RECOMMENDED $13,499 $2,967 $11,092
139,121
kWh
$1,975
-
kW-mo/yr
$432
TOTAL IMPLEMENTED $3,976 $516 $2,000
25,091
kWh
$1,849
-
kW-mo/yr
$127
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs