46
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Electroplating, plating, polishing, anodizing, and coloring | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK0960 #06 Y:2016 | 06 | 2016 | Improve air circulation with destratification fans / other methods | $2,672 | $13,125 | |
| OK0960 #05 Y:2016 | 05 | 2016 | Install compressor air intakes in coolest locations | $770 | $150 | |
| OK0960 #04 Y:2016 | 04 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $2,164 | $3,055 | |
| OK0960 #03 Y:2016 | 03 | 2016 | Analyze flue gas for proper air/fuel ratio | $917 | $600 | |
| OK0960 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $4,955 | $5,880 | |
| OK0960 #01 Y:2016 | 01 | 2016 | Install occupancy sensors | $287 | $847 | |
| WV0534 #11 Y:2016 | 11 | 2016 | Reduce the pressure of compressed air to the minimum required | $144 | $50 | |
| WV0534 #10 Y:2016 | 10 | 2016 | Develop a repair/replace policy | $471 | $1,125 | |
| WV0534 #09 Y:2016 | 09 | 2016 | Eliminate or reduce compressed air usage | $474 | $256 | |
| WV0534 #08 Y:2016 | 08 | 2016 | Install occupancy sensors | $616 | $315 | |
| WV0534 #07 Y:2016 | 07 | 2016 | Insulate bare equipment | $1,196 | $1,953 | |
| WV0534 #06 Y:2016 | 06 | 2016 | Use waste heat from hot flue gases to preheat | $1,300 | $2,900 | |
| WV0534 #05 Y:2016 | 05 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $1,565 | $4,150 | |
| WV0534 #04 Y:2016 | 04 | 2016 | Analyze flue gas for proper air/fuel ratio | $2,026 | $4,100 | |
| WV0534 #03 Y:2016 | 03 | 2016 | Establish a predictive maintenance program | $2,083 | $1,000 | |
| WV0534 #02 Y:2016 | 02 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $3,016 | - | |
| WV0534 #01 Y:2016 | 01 | 2016 | Change rate schedules or other changes in utility service | $28,092 | $3,000 | |
| OR0677 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $1,207 | $944 | |
| OR0677 #05 Y:2016 | 05 | 2016 | Insulate bare equipment | $2,064 | $658 | |
| OR0677 #04 Y:2016 | 04 | 2016 | Utilize higher efficiency lamps and/or ballasts | $10,583 | $22,256 |