ITAC Assessment: WV0534
ITAC logo
ITAC Assessment: WV0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Anodized Aluminum
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 40,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,327 2,582,400
kWh
Electricity Demand $59,691 7,831
kW-mo/yr
Electricity Fees $980 -
Natural Gas $52,495 10,098
MMBtu
TOTAL YEARLY COSTS $315,493
RECOMMENDED SAVINGS* $40,983 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $28,092 $3,000 - - $28,092 - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,016 - $2,543
32,472
kWh
$473
-
kW-mo/yr
- - -
03 2.4157: Establish a predictive maintenance program $2,083 $1,000 $2,256
28,818
kWh
$419
-
kW-mo/yr
- - $(-592.0)
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,026 $4,100 - - - $2,101
-
MMBtu
$(-75.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,565 $4,150 $1,321
16,874
kWh
$244
-
kW-mo/yr
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $1,300 $2,900 - - - $1,300
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,196 $1,953 - - - $1,196
-
MMBtu
-
08 2.7135: Install occupancy sensors $616 $315 $517
6,604
kWh
$99
-
kW-mo/yr
- - -
09 2.4239: Eliminate or reduce compressed air usage $474 $256 $398
5,089
kWh
$76
-
kW-mo/yr
- - -
10 2.4151: Develop a repair/replace policy $471 $1,125 $522
6,662
kWh
$99
-
kW-mo/yr
- - $(-150.0)
11 2.4231: Reduce the pressure of compressed air to the minimum required $144 $50 $121
1,548
kWh
$23
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $40,983 $18,849 $7,678
98,067
kWh
$1,433
-
kW-mo/yr
$28,092 $4,597
-
MMBtu
$(-817.0)
TOTAL IMPLEMENTED $10,026 $8,799 $6,357
81,193
kWh
$1,189
-
kW-mo/yr
- $3,297
-
MMBtu
$(-817.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings