ITAC Assessment: UU0115
ITAC logo
ITAC Assessment: UU0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 25,000
ft2
Annual Production 60,000
bbl
Production Hrs. Annual 6,188
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,505 964,680
kWh
Electricity Demand $47,234 3,779
kW-mo/yr
Electricity Fees $30,798 -
Natural Gas $45,144 7,949
MMBtu
Waste Disposal Costs
Water Usage $19,540 110
Tgal
TOTAL YEARLY COSTS $178,221
RECOMMENDED SAVINGS* $12,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,346

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7122: Disconnect ballasts $296 - $153
4,216
kWh
$108
-
kW-mo/yr
$35 -
02 2.7135: Install occupancy sensors $444 $438 $112
3,074
kWh
$251
-
kW-mo/yr
$81 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,840 - - - $1,840 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $931 $2,500 $931
26,298
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $8,766 - - - - $8,766
-
MMBtu
TOTAL RECOMMENDED $12,277 $2,938 $1,197
33,589
kWh
$359
-
kW-mo/yr
$1,956 $8,766
-
MMBtu
TOTAL IMPLEMENTED $11,346 $438 $265
7,291
kWh
$359
-
kW-mo/yr
$1,956 $8,766
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs