Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

857

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electroplating, plating, polishing, anodizing, and coloring
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0346 #10 Y:2026 Recharge batteries on during off-peak demand periods $1,696 -
IC0346 #09 Y:2026 Use or replace with energy efficient substitutes $382 $120
IC0346 #08 Y:2026 Use solar heat to make electricty $97,303 $441,248
IC0346 #07 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $19,018 $66,675
IC0346 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $11,424 $27,615
IC0346 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,665 $3,200
IC0346 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $788 $926
IC0346 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $313 $346
IC0346 #02 Y:2026 Install / repair insulation on steam lines $11,700 $94,345
IC0346 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $296 -
UU0291 #04 Y:2025 Use battery storage for demand control $42,705 $425,680
UU0291 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,137 $20,945
UU0291 #02 Y:2025 Eliminate or reduce compressed air usage $5,305 $25,680
UU0291 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $17,270 $5,900
AM0969 #09 Y:2025 Optimize plant power factor $10,221 $1,076
AM0969 #08 Y:2025 Apply for tax-free status for energy purchases $11,200 $15,000
AM0969 #07 Y:2025 Use solar heat to make electricty $5,096 $71,900
AM0969 #06 Y:2025 Change rate schedules or other changes in utility service $1,819 $7,800
AM0969 #05 Y:2025 Replace existing hvac unit with high efficiency model $9,190 $75,000
AM0969 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $2,342 $47