Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

775

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electroplating, plating, polishing, anodizing, and coloring
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0317 #13 Y:2024 Insulate bare equipment $2,154 $4,516
IC0317 #12 Y:2024 Install smaller boiler (increase high fire duty cycle) $11,344 $21,200
IC0317 #11 Y:2024 Install occupancy sensors $151 $425
IC0317 #10 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $397 $597
IC0317 #09 Y:2024 Utilize energy-efficient belts and other improved mechanisms $972 $2,234
IC0317 #08 Y:2024 Use radiant heater for spot heating $15,053 $20,087
IC0317 #07 Y:2024 Use solar heat to make electricty $32,668 $129,265
IC0317 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $704 -
IC0317 #05 Y:2024 Eliminate or reduce compressed air usage $2,337 $108
IC0317 #04 Y:2024 Install compressor air intakes in coolest locations $431 $1,113
IC0317 #03 Y:2024 Recharge batteries on during off-peak demand periods $930 -
IC0317 #02 Y:2024 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $10,127 $7,240
IC0317 #01 Y:2024 Install efficient rectifiers $6,191 $19,124
UL2412 #03 Y:2024 Recover waste heat from equipment $5,217 $13,000
UL2412 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,324 $627
UL2412 #01 Y:2024 Use solar heat to make electricty $30,391 $318,570
SJ0023 #07 Y:2024 Insulate bare equipment $190 $380
SJ0023 #06 Y:2024 Reduce the pressure of compressed air to the minimum required $2,625 -
SJ0023 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,164 $1,874
SJ0023 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,823 $2,466