ITAC Assessment: IC0327
ITAC logo
ITAC Assessment: IC0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Nickel and Chromium Electroplating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 206,000
ft2
Annual Production 123,143
ton
Production Hrs. Annual 4,420
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $849,025 8,815,152
kWh
Electricity Demand $446,667 23,539
kW-mo/yr
Electricity Fees $31,003 -
Natural Gas $220,785 106,210
MMBtu
Waste Disposal Costs
Water Usage $146,408 12,460
Tgal
TOTAL YEARLY COSTS $1,693,887
RECOMMENDED SAVINGS* $105,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,206 $226 $1,461
15,218
kWh
$745
-
kW-mo/yr
-
02 2.1133: Adjust burners for efficient operation $11,584 $631 - - $11,584
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,276 - $3,136
32,664
kWh
$140
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $1,870 $5,460 - - $1,870
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,732 $1,026 $1,661
17,304
kWh
$71
-
kW-mo/yr
-
06 2.2135: Repair and eliminate steam leaks $5,105 $1,367 - - $5,105
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $696 $288 $461
4,800
kWh
$235
-
kW-mo/yr
-
08 2.3212: Optimize plant power factor $77,211 $108,749 - $77,211
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $1,978 $756 - - $1,978
-
MMBtu
TOTAL RECOMMENDED $105,657 $118,504 $6,719
69,986
kWh
$78,402
-
kW-mo/yr
$20,536
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs