380
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal heat treating | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TT0177 #06 Y:2016 | 06 | 2016 | Recover waste heat from equipment | $1,002 | $1,400 | |
| TT0177 #05 Y:2016 | 05 | 2016 | Optimize plant power factor | $1,603 | $5,250 | |
| TT0177 #04 Y:2016 | 04 | 2016 | Insulate bare equipment | $2,669 | $1,720 | |
| TT0177 #03 Y:2016 | 03 | 2016 | Turn off equipment when not in use | $4,803 | $500 | |
| TT0177 #02 Y:2016 | 02 | 2016 | Upgrade controls on compressors | $6,467 | $250 | |
| TT0177 #01 Y:2016 | 01 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $7,244 | $15,800 | |
| SD0525 #10 Y:2015 | 10 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $535 | $144 | |
| SD0525 #09 Y:2015 | 09 | 2015 | Use photocell controls | $847 | $1,480 | |
| SD0525 #08 Y:2015 | 08 | 2015 | Insulate bare equipment | $1,494 | $527 | |
| SD0525 #07 Y:2015 | 07 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,715 | $200 | |
| SD0525 #06 Y:2015 | 06 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,406 | $1,200 | |
| SD0525 #05 Y:2015 | 05 | 2015 | Clean or color roof to reduce solar load | $2,666 | $7,316 | |
| SD0525 #04 Y:2015 | 04 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $3,051 | $2,510 | |
| SD0525 #03 Y:2015 | 03 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,617 | $7,417 | |
| SD0525 #02 Y:2015 | 02 | 2015 | Use waste heat from hot flue gases to preheat | $10,754 | $16,450 | |
| SD0525 #01 Y:2015 | 01 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $11,264 | $750 | |
| BS0053 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $220 | $600 | |
| BS0053 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $660 | $3,120 | |
| BS0053 #04 Y:2015 | 04 | 2015 | Cover open tanks | $44 | $50 | |
| BS0053 #03 Y:2015 | 03 | 2015 | Insulate bare equipment | $826 | $968 |