ITAC Assessment: TT0177
ITAC logo
ITAC Assessment: TT0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Heat Treating Services
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 21,100
ft2
Annual Production 2,800,000
units
Production Hrs. Annual 6,864
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,099 1,932,300
kWh
Electricity Demand $61,608 6,351
kW-mo/yr
Natural Gas $136,366 37,093
MMBtu
TOTAL YEARLY COSTS $328,073
RECOMMENDED SAVINGS* $24,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,244 $15,800 $7,244
107,640
kWh
- -
02 2.4224: Upgrade controls on compressors $6,467 $250 $6,467
96,096
kWh
- -
03 2.6218: Turn off equipment when not in use $4,803 $500 $4,803
71,365
kWh
- -
04 2.2511: Insulate bare equipment $2,669 $1,720 - - $2,669
-
MMBtu
05 2.3212: Optimize plant power factor $1,603 $5,250 - $1,603
-
kW-mo/yr
-
06 2.2437: Recover waste heat from equipment $1,002 $1,400 - - $1,002
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $663 $150 $663
9,846
kWh
- -
08 2.4227: Use compressor air filters $338 $75 $270
4,024
kWh
$68
-
kW-mo/yr
-
09 2.7261: Install timers and/or thermostats $108 $23 $68
1,005
kWh
- $40
-
MMBtu
TOTAL RECOMMENDED $24,897 $25,168 $19,515
289,976
kWh
$1,671
-
kW-mo/yr
$3,711
-
MMBtu
TOTAL IMPLEMENTED $2,003 $1,625 $933
13,870
kWh
$68
-
kW-mo/yr
$1,002
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs