Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

380

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal heat treating
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0635 #02 Y:2023 Use battery storage for demand control $57,958 -
SD0635 #01 Y:2023 Use solar heat to make electricty $77,202 $252,463
OR0766 #03 Y:2023 Utilize energy-efficient belts and other improved mechanisms $2,352 -
OR0766 #02 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,610 -
OR0766 #01 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $20,906 $4,856
IC0275 #06 Y:2022 Insulate bare equipment $5,165 $8,778
IC0275 #05 Y:2022 Use solar heat to make electricty $121,502 $1,271,713
IC0275 #04 Y:2022 Insulate glazing, walls, ceilings, and roofs $137 $337
IC0275 #03 Y:2022 Eliminate or reduce compressed air usage $5,724 $433
IC0275 #02 Y:2022 Install compressor air intakes in coolest locations $2,480 $823
IC0275 #01 Y:2022 Use insulation in furnaces to facilitate heating / cooling $1,479 $985
TT0251 #11 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,308 $150
TT0251 #10 Y:2021 Insulate bare equipment $2,602 $297
TT0251 #09 Y:2021 Eliminate or reduce compressed air usage $1,884 $40
TT0251 #08 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $2,374 $15,800
TT0251 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $5,136 $35,365
TT0251 #06 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $6,965 $15,800
TT0251 #05 Y:2021 Upgrade controls on compressors $9,683 $250
TT0251 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $16,814 $2,000
TT0251 #03 Y:2021 Adopt in-house material generation $42,490 $112,956