ITAC Assessment: IC0275
ITAC logo
ITAC Assessment: IC0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Forged and Casted Rolls
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $50
M
to 100
M
# of Employees 87
Plant Area 100,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 6,656
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $546,221 7,244,736
kWh
Electricity Demand $438,552 33,755
kW-mo/yr
Electricity Fees $198,145 -
Natural Gas $161,752 24,630
MMBtu
TOTAL YEARLY COSTS $1,344,670
RECOMMENDED SAVINGS* $136,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,479 $985 - - $1,479
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,480 $823 $1,918
23,978
kWh
$562
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $5,724 $433 $3,127
39,092
kWh
$2,597
-
kW-mo/yr
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $137 $337 - - $137
-
MMBtu
05 2.9114: Use solar heat to make electricty $121,502 $1,271,713 $112,517
1,406,464
kWh
$8,985
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $5,165 $8,778 $5,165
64,565
kWh
- -
TOTAL RECOMMENDED $136,486 $1,283,069 $122,727
1,534,099
kWh
$12,144
-
kW-mo/yr
$1,615
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs