ITAC Assessment: WV0409
ITAC logo
ITAC Assessment: WV0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plastic Injection Molded Products
NAICS 333511: Industrial Mold Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 55,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,741 2,265,750
kWh
Electricity Demand $84,354 6,059
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $4,682 467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,346 $55,900 $14,054
226,244
kWh
$6,292
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,013 $7,800 - $6,013
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,475 $2,838 $2,250
36,215
kWh
$1,225
-
kW-mo/yr
- -
04 2.4151: Develop a repair/replace policy $3,087 $625 $2,298
36,997
kWh
$1,029
-
kW-mo/yr
- $(-240.0)
05 2.4311: Recover mechanical energy $2,064 $1,000 $1,724
27,751
kWh
$780
-
kW-mo/yr
- $(-440.0)
06 2.2437: Recover waste heat from equipment $1,693 $985 - - $1,693
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,490 $600 $1,029
16,560
kWh
$461
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,480 - $1,026
16,525
kWh
$454
-
kW-mo/yr
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,292 $3,520 $888
14,295
kWh
$404
-
kW-mo/yr
- -
10 2.2611: Moderate cooling tower outlet temperature $1,165 $400 $1,165
18,759
kWh
- - -
11 2.2515: Use optimum thickness insulation $1,139 $625 $791
12,739
kWh
$348
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $544 $690 $377
6,062
kWh
$167
-
kW-mo/yr
- -
TOTAL RECOMMENDED $43,788 $74,983 $25,602
412,147
kWh
$17,173
-
kW-mo/yr
$1,693
-
MMBtu
$(-680.0)
TOTAL IMPLEMENTED $10,824 $7,583 $7,491
120,592
kWh
$3,573
-
kW-mo/yr
- $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs