ITAC Assessment: TT0251
ITAC logo
ITAC Assessment: TT0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Heat Treating
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 21,600
ft2
Annual Production 2,800,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,045 2,086,800
kWh
Electricity Demand $73,183 6,750
kW-mo/yr
Electricity Fees $4,317 -
Natural Gas $121,818 21,105
MMBtu
Waste Disposal Costs
Water Usage $6,958 1,899,425
Tgal
Water Disposal $10,767 1,899,425
Tgal
TOTAL YEARLY COSTS $352,088
RECOMMENDED SAVINGS* $242,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $95,933 $4,500 $74,843
1,156,584
kWh
$21,090
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $56,927 $200 - - $56,927 - -
03 4.212: Adopt in-house material generation $42,490 $112,956 $(-3,162.0)
(-48,867)
kWh
- $45,652 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,814 $2,000 - - - - $16,814
05 2.4224: Upgrade controls on compressors $9,683 $250 $9,683
149,635
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,965 $15,800 $6,965
107,640
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,136 $35,365 $1,106
17,091
kWh
$4,030
-
kW-mo/yr
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,374 $15,800 $2,374
36,687
kWh
- - - -
09 2.4239: Eliminate or reduce compressed air usage $1,884 $40 $1,884
29,121
kWh
- - - -
10 2.2511: Insulate bare equipment $2,602 $297 - - - $2,602
-
MMBtu
-
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,308 $150 $1,308
20,206
kWh
- - - -
TOTAL RECOMMENDED $242,116 $187,358 $95,001
1,468,097
kWh
$25,120
-
kW-mo/yr
$102,579 $2,602
-
MMBtu
$16,814
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs