ITAC Assessment: MA0387
ITAC logo
ITAC Assessment: MA0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Christmas Tree Stands
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 253,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,656
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,804 2,783,998
kWh
Electricity Demand $93,059 9,540
kW-mo/yr
Electricity Fees $(-6,448.0) -
Natural Gas $100,135 17,901
MMBtu
LPG $4,544 391
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,170 $8,401 $7,170
116,354
kWh
- - -
02 2.2136: Install / repair insulation on steam lines $1,430 $1,230 - $1,430
-
MMBtu
- -
03 3.4145: Use magnetic technology to treat water $2,453 $5,640 - - $2,453
-
gal
-
04 4.821: Pay bills on time to avoid late fees $3,251 - - - - $3,251
05 2.2612: Use cooling tower water instead of refrigeration $5,662 $21,410 $5,662
95,252
kWh
- - -
TOTAL RECOMMENDED $19,966 $36,681 $12,832
211,606
kWh
$1,430
-
MMBtu
$2,453
-
gal
$3,251
TOTAL IMPLEMENTED $4,681 $1,230 - $1,430
-
MMBtu
- $3,251
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs